A selection of design/build, critical-environment, and process mechanical work across Northern Colorado. Each case study covers the scope, the systems, and what the owner got out of it.

Advanced Energy · Fort Collins, CO
5,000 SF ISO 7 cleanroom designed, built, and certified in an 8-month construction window — custom make-up air, humidification, process gases, and pressurization.
View case study →
NREL · Golden, CO
Hazardous exhaust system added inside an operating ISO 5 cleanroom — welded 316 stainless ductwork, existing-conditions Revit modeling, downtime limited to scheduled MOP windows.
View case study →
Advanced Energy · Fort Collins, CO
Design and installation of a complex process cooling plant — 125-ton chiller with waterside economizer — executed with zero lab downtime.
View case study →
Advanced Energy · Fort Collins, CO
Four years of phased mechanical renovation across an operating manufacturing campus — 30 rooftop units, a new boiler room, 26 VAV boxes, and zero interrupted production.
View case study →
Woodward · Fort Collins & Windsor, CO
A 15+ year relationship spanning manufacturing renovations, a 160-ton chiller installation, process cooling for new labs, and compressed air and distilled water utilities to machining equipment.
View case study →
Carbon Valley Recreation Center · Firestone, CO
16+ years of service culminating in a pool mechanical replacement — boilers, flat-plate heat exchangers, and a three-section pool dehumidification air handler set by crane.
View case study →| Cleanroom | Class 10,000 cleanroom, Colorado Concept Coatings (2018) — process cooling chiller, custom air handling unit, ductwork, refrigeration piping, and utility connections, self-performed and commissioned to specification. |
|---|---|
| Education | Estes Park School District — 20+ years of service and projects, including a CTE building dust-collection system meeting ATEX and NFPA standards. Thompson School District — service provider since 2017 with successful project delivery. |
| Office | 45,000 SF office design/build renovation with multi-zone systems and new controls, delivered under aggressive phasing in an operating facility. |
| Industrial | Warehouse office conditioning and relocation of a 100 HP air compressor with ducting and airline distribution (Buckingham Warehouse, 2019–2020). |
| Municipal | Long-term service relationships with the City of Greeley, City of Longmont Parks & Recreation, Estes Park Recreation Center, and Carbon Valley Recreation District. |
Talk directly with the engineer who will design it and the superintendent who will build it.