Critical-environment, process, and facility mechanical work across Northern Colorado — delivered as design-build, as a subcontractor to a general contractor, and as competitively bid plan and spec. Each case study states the challenge, the approach, the mechanical scope, the constraint we had to work inside, and the result.

Advanced Energy · Fort Collins, CO
5,000 SF ISO 7 cleanroom designed, built, and certified in an 8-month window — custom make-up air, humidification, process gases, and pressurization. ASE services it today.
View case study →
NREL · Golden, CO
Welded 316 stainless exhaust added inside an operating ISO 5 cleanroom — prefabricated off-site, installed with downtime confined to scheduled MOP windows.
View case study →
Advanced Energy · Fort Collins, CO
125-ton chiller with waterside economizer, designed and installed as prime contractor for a laboratory that never stopped operating.
View case study →
Advanced Energy · Fort Collins, CO
30 rooftop units, a new boiler room, and 26 VAV boxes across an operating manufacturing campus — as prime to the owner and as mechanical subcontractor to Mortenson.
View case study →
Woodward · Fort Collins & Windsor, CO
A 15+ year program: 160-ton chiller, process cooling for new labs, compressed air and distilled water to machining equipment — alongside the service contract on the same systems.
View case study →
Carbon Valley Recreation Center · Firestone, CO
Boilers, flat-plate heat exchangers, and a three-section pool dehumidification unit — won on design, earned by sixteen years of service on the building.
View case study →| Cleanroom | Class 10,000 cleanroom, Colorado Concept Coatings (2018) — process cooling chiller, custom air handling unit, ductwork, refrigeration piping, and utility connections, self-performed and commissioned to specification. |
|---|---|
| Education | Estes Park School District — 20+ years of service and projects, including a CTE building dust-collection system meeting ATEX and NFPA standards. Thompson School District — service provider since 2017 with successful project delivery. |
| Office | 45,000 SF office design/build renovation with multi-zone systems and new controls, delivered under aggressive phasing in an operating facility. |
| Industrial | Warehouse office conditioning and relocation of a 100 HP air compressor with ducting and airline distribution (Buckingham Warehouse, 2019–2020). |
| Municipal | Long-term service relationships with the City of Greeley, City of Longmont Parks & Recreation, Estes Park Recreation Center, and Carbon Valley Recreation District. |
Service call, bid invitation, or a system you need designed and built — start with the people who will actually do the work.