← All projects Manufacturing · Service & Construction Program

Manufacturing & Lab Utilities Program

ProjectManufacturing & Lab Mechanical Utilities — Ongoing Program
LocationFort Collins & Windsor, Colorado
OwnerWoodward
DeliveryDesign-build with Mortenson (Drake Campus) · owner-direct for chiller, lab utility, and RTU projects · service provider since 2016
Completed2014–present
Systems160-ton chiller · process cooling · compressed air · distilled water · air handling units · rooftop units · exhaust & chilled water distribution

The challenge

Woodward's Fort Collins and Windsor facilities run precision machining and environmental test equipment that depend on mechanical utilities most HVAC contractors never touch — and that cannot be taken out of service casually.

The approach

Rather than a single project, this has been an ongoing program combining service and construction on the same systems: ASE maintains the equipment, and is brought back to build the next phase. Work has been delivered as design-build alongside Mortenson at the Drake campus and owner-direct everywhere else.

Selected work

  • 2022–2023 — Drake Campus manufacturing renovation. Design-build with Mortenson: 20,000 SF of manufacturing space including HVAC and utility requirements — compressed air and distilled water piped to machining equipment.
  • 2024 — 160-ton chiller installation. Rigging, welded piping, and full system commissioning.
  • 2024 — RMTIC 2 lab utilities. Process cooling and HVAC utilities for a new laboratory.
  • RMTIC Windsor. Two large air handling units with new ductwork and chilled water lines (2014); four new RTUs totaling 65 tons with roof curbs and structural reinforcement (2021); chiller and piping replacement (2023).
  • 2017 — Department relocation. Complete mechanical fit-out moving a department from the Drake campus to Loveland: exhaust fans, ducting, chilled water, and compressed air lines.

Operational constraint

Active manufacturing and environmental test facilities. Utility outages have to be planned around production and test schedules, not the other way around.

Result

ASE has been Woodward's service provider since 2016, maintaining chillers, HVAC equipment, and environmental test chambers. The construction work keeps coming back for the same reason the service contract does: systems that get commissioned right and stay reliable. Service and construction aren't separate businesses here — what our technicians learn on Woodward's equipment every month is what makes the next design right.

Setting mechanical equipment at the building exterior
Setting mechanical equipment at the building exterior

Mechanical work that has to be right?

Service call, bid invitation, or a system you need designed and built — start with the people who will actually do the work.

Contact ASE